DOWNSVILLE — Delaware County DPW will be closing BR 95, the Downsville Covered Bridge, over the East Branch of the Delaware River to through traffic, beginning on Wednesday, May 13, at 7:30 a.m. through Friday, May 15, until 6:00 p.m. to inspect the bridge. The traveling public should use alternate routes.
Downsville Covered Bridge Closed May 13-15
The Mountain Eagle
Author
QR Code
Scan to read this article online. Right-click the image or use the download button to save it for print.
Download PNG